NEWS

NEWS
News

Current News | Archives


INSPIRATION INTERSECTS 0.313% NI OVER 48.88M OR 160.37FT CONTAINING 1.000% NI OVER 1.23M OR 4.04FT (TRUE WIDTH)

FOR IMMEDIATE RELEASE

February, 27 2009 TSX - ISM Frankfurt- OI8

Toronto, Ontario - Inspiration Mining Corporation (the “Corporation”) is pleased to announce the results of the continuation of their diamond drilling program on its Langmuir Project, located in Langmuir Township south of Timmins, Ontario. The Langmuir Property consists of 69 unpatented contiguous mining claim units covering approximately 1090 hectares in the north-central portion of Langmuir Township, Porcupine Mining Division, and District of Cochrane, Ontario. The property is approximately 25 km southeast of Timmins, Ontario, and hosts the past producing Langmuir No.1 Mine, and majority of the past producing Langmuir No. 2 Mine.

Inspiration is continuing the drilling at the Langmuir Project – Langmuir No.2 Mine – North Zone.  The detail fill-in drill program is designed to complete the definition of the nickel bearing mineralization.  Several drill holes were terminated in nickel bearing mineralization and these drill holes have been extended.

The following table indicates the drill information for the North Zone drill holes:

Drill Hole

Grid Northing (metres)

Grid Easting (metres)

Dip

Azimuth (Geodetic)

Section Northing (metres)

Section Easting (metres)

Length (m)

LN08-136

3081.83

2006.08

-70.01

299.53

3671.98

196.40

413.47

LN08-137

3082.73

1958.46

-55.85

299.03

3648.96

154.71

229.29

LN08-138

3082.57

1958.70

-61.17

298.32

3648.94

155.00

260.39

LN08-139

3055.72

2004.20

-54.37

300.57

3648.43

207.83

287.35

LN08-140

3055.61

2004.36

-61.89

300.38

3648.42

208.02

310.46


Drill hole LN08-136 was completed on Section 3675 North and below previously released drill holes LN08-133 to LN08-135.

Drill holes LN08-137 and LN08-138 were drilled approximately 41 meters west and 23 meters south of LN08-136 and LN08-139 and LN08-140 were drilled approximately 53 meters east of LN08-137.  These drill holes were drilled down dip from previously released drill hole LN06-43 and up dip from previously released drill holes LN08-107, which contained 1.042% Ni over 9.95 meters or 32.64 feet (true thickness) from 282.40m to 296.00m.

The following revised assay results for drill holes LN08-136 to LN08-140, inclusively at the Langmuir No.2 Mine – North Zone have been received, compiled and condensed to the following:

 

Drill Hole

From (m)

To (m)

Core Length (m)

True Width (m)

Core Length (ft)

True Width   (ft)

Weighted Average Ni (%)

LN08-136

 

194.06

241.70

47.64

29.33

156.30

96.23

0.243

       and

 

251.00

330.40

79.40

48.88

260.50

160.37

0.313

contains

293.00

295.00

2.00

1.23

6.56

4.04

1.000

 

301.00

304.00

3.00

1.85

9.84

6.07

0.393

 

320.00

330.40

10.40

6.40

34.12

21.00

0.530

 

321.00

325.00

4.00

2.46

13.12

8.07

0.635

 

326.00

328.72

2.72

1.67

8.92

5.48

0.610

       and

 

334.55

360.42

25.87

15.93

84.88

52.26

0.432

and contains

344.00

348.00

4.00

2.46

13.12

8.07

0.774

or

345.00

347.00

2.00

1.23

6.56

4.04

1.023

and

352.12

360.42

8.30

5.11

27.23

16.77

0.604

with

357.50

360.42

2.92

1.80

9.58

5.91

0.833

       and

 

367.30

377.00

9.70

5.97

31.82

19.59

0.523

or

371.30

377.00

5.70

3.51

18.70

11.52

0.744

or

372.10

374.00

1.90

1.17

6.23

3.84

1.052

LN08-137

 

117.40

130.70

13.30

10.48

43.64

34.38

0.246

       and

 

148.13

149.84

1.71

1.35

5.61

4.43

1.271

or

148.13

149.32

1.19

0.94

3.90

3.08

1.710

LN08-138

 

142.00

163.11

21.11

15.44

69.26

50.66

0.264

 

232.70

234.50

1.80

1.32

5.91

4.33

0.255

LN08-139

 

170.50

186.50

16.00

12.78

52.49

41.93

0.269

       and

 

216.10

223.00

6.90

5.51

22.64

18.08

0.201

LN08-140

 

172.79

205.40

32.61

24.23

106.99

79.49

0.307

or

184.00

193.00

9.00

6.69

29.53

21.95

0.373

       and

 

220.45

236.70

16.25

12.08

53.31

39.63

0.352

       and

 

243.00

266.17

23.17

17.22

76.02

56.50

0.297

The nickel bearing sulphide mineralization, with estimations ranging from 1% to 20% fine-grained disseminatations up to massive 100% sulphides, is contained within serpentenized komatiitic ultramaftic extrusive flows with occasional spinifex texture.

The assaying technique used is the industry standard for base metal assaying, which uses nitric and hydrochloric acids that extracts nickel only from sulphide mineralization and not from nickel silicate minerals.

The assaying of split core samples was conducted by Swastika Laboratories, and included the insertion of

blanks and standards. The Qualified Person in charge of the Langmuir Project and the person who prepared the

technical data in this release is Kian Jensen, B.Sc., P.Geo. (On), who is an arm's length party retained by the

Company to carry out its exploration program on the Langmuir Project.

For further information, please contact Randy Miller, President of the Company, at tel: 416-842-9000, www.inspirationmining.com

For Investor Relations call:
Gale Capital Corporation
Ph. 604.221.7604
Fax 604.221.7606
galecapital@shaw.ca

The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Newsletter Sign-Up

Enter your email to receive email updates from us