NEWS

NEWS
News

Current News | Archives


INSPIRATION INTERSECTS 0.445% NI OVER 119.69M OR 392.68FT CONTAINING 1.462% NI OVER 5.14M OR 16.86FT AND 1.389% NI OVER 3.21M OR 10.53 FT (TRUE WIDTH)

FOR IMMEDIATE RELEASE

March, 02 2009 TSX - ISM Frankfurt- OI8

Toronto, Ontario - Inspiration Mining Corporation (the "Corporation") is pleased to announce the results of the continuation of their diamond drilling program on its Langmuir Project, located in Langmuir Township south of Timmins, Ontario. The Langmuir Property consists of 69 unpatented contiguous mining claim units covering approximately 1090 hectares in the north-central portion of Langmuir Township, Porcupine Mining Division, and District of Cochrane, Ontario. The property is approximately 25 km southeast of Timmins, Ontario, and hosts the past producing Langmuir No.1 Mine, and majority of the past producing Langmuir No. 2 Mine.

Inspiration is continuing the drilling at the Langmuir Project � Langmuir No.2 Mine � North Zone.  The detail fill-in drill program is designed to complete the definition of the nickel bearing mineralization.  Several drill holes were terminated in nickel bearing mineralization and these drill holes have been extended.

The following table indicates the drill information for the North Zone drill holes:

 

Drill Hole

Grid Northing (metres)

Grid Easting (metres)

Dip

Azimuth (Geodetic)

Section Northing (metres)

Section Easting (metres)

Length (m)

LN08-141

3135.94

2018.52

-65.62

298.15

3725.06

180.12

326.40

LN08-142

3135.82

2018.63

-69.42

304.53

3725.02

180.28

385.71

LN08-143

3135.71

2018.77

-74.20

313.53

3724.99

180.45

448.94

LN08-144

3025.17

2007.08

-65.80

300.10

3623.42

225.60

407.87

LN08-145

3025.02

2007.35

-72.74

300.32

3623.42

225.91

461.38

LN08-146

2996.07

2011.86

-50.89

300.18

3600.60

244.28

291.49

LN08-147

2995.87

2012.19

-59.19

299.48

3600.60

244.67

332.09

LN08-148

drill hole planned but not drilled

Drill hole LN08-141 to LN08-143 were completed from the same drill setup.  It appears that holes LN08-141 and LN08-142 intersected the higher-grade nickel mineralization of the North Shoot approximately 50 metres down dip from previously released drill hole LN06-57.  Drill hole LN08-143 deviated northwards and intersected the lower grade nickel halo mineralization below previously released LN07-101.

Drill holes LN08-144 and LN08-145 were drilled approximately 41 metres and 87 metres, respectively, below previously released drill hole LN08-114.  It appears that LN08-144 intersected a portion, 0.953 % Ni over 4.38 metres or 14.37 feet (true widths) of the high grade nickel mineralization of the North Shoot.

Drill holes LN08-146 and LN08-147 were completed approximately 23 meters south and 19 metres east of LN08-144 and LN08-145.  These drill holes were below previously released drill hole LN08-110 and up dip from previously released drill hole LN08-115.  LN08-146 intersected a portion of the nickel halo mineralization while LN08-147 contained only anomalous nickel values.

Drill Hole LN08-148 was planned at the same setup but was not drilled.

The following revised assay results for drill holes LN08-141 to LN08-148, inclusively at the Langmuir No.2 Mine � North Zone have been received, compiled and condensed to the following:

Drill Hole

From (m)

To (m)

Core Length (m)

True Width (m)

Core Length (ft)

True Width   (ft)

Weighted Average Ni (%)

 

LN08-141

 

136.00

322.20

186.20

119.69

610.89

392.68

0.445

or

242.00

322.20

80.20

51.55

263.12

169.13

0.649

 and contains

 

242.00

276.00

34.00

21.85

111.55

71.69

0.886

with

242.00

250.00

8.00

5.14

26.25

16.86

1.462

 

250.00

254.00

4.00

2.57

13.12

8.43

0.945

 

258.00

263.00

5.00

3.21

16.40

10.53

1.389

 

263.00

268.00

5.00

3.21

16.40

10.53

0.602

       and

 

285.00

292.55

7.55

4.85

24.77

15.91

0.535

       and

 

295.18

306.17

10.99

7.06

36.06

23.16

0.698

       and

 

311.21

319.08

7.87

5.06

25.82

16.60

0.818

 

LN08-142

 

144.00

299.49

155.49

93.58

510.14

307.02

0.321

 and contains

 

239.20

246.00

6.80

4.09

22.31

13.42

0.473

 

260.00

282.40

22.40

13.48

73.49

44.23

0.613

with

267.80

272.49

4.69

2.82

15.39

9.25

1.609

or

269.50

272.49

2.99

1.80

9.81

5.91

2.051

 

270.20

271.68

1.48

0.89

4.86

2.92

2.442

       and

 

312.00

334.00

22.00

13.24

72.18

43.44

0.477

with

323.00

330.00

7.00

4.21

22.97

13.81

0.861

 

LN08-143

 

195.00

345.00

150.00

77.26

492.13

253.48

0.291

 and contains

 

196.00

211.00

15.00

7.73

49.21

25.36

0.308

 

279.00

292.00

13.00

7.21

42.65

23.65

0.373

 

299.00

312.00

13.00

6.70

42.65

21.98

0.408

 

331.00

342.00

11.00

5.67

36.09

18.60

0.410

 

LN08-144

 

280.00

321.67

41.67

26.78

136.71

87.86

0.359

 and contains

 

304.32

311.13

6.81

4.38

22.34

14.37

0.953

or

305.15

310.00

4.85

3.12

15.91

10.24

1.009

 

Drill Hole

From (m)

To (m)

Core Length (m)

True Width (m)

Core Length (ft)

True Width   (ft)

Weighted Average Ni (%)

 

LN08-145

 

300.30

379.00

   78.70

   45.14

  258.20

  148.10

   0.318

 and contains

 

308.00

323.00

15.00

8.60

49.21

28.22

0.419

 

352.00

358.00

6.00

3.44

19.69

11.29

0.515

with

352.00

353.00

1.00

0.57

3.28

1.87

    1.160

 

370.00

379.00

9.00

5.16

29.53

16.93

0.457

       and

 

386.70

391.65

4.95

2.84

16.24

9.32

0.334

 

LN08-146

 

189.00

194.00

5.00

4.15

16.40

13.62

0.312

       and

 

211.00

222.27

11.27

9.34

36.98

30.64

0.236

 

LN08-147

anomalous values

 

LN08-148

drill hole planned but not drilled

 

The nickel bearing sulphide mineralization, with estimations ranging from 1% to 20% fine-grained disseminatations up to massive 100% sulphides, is contained within serpentenized komatiitic ultramaftic extrusive flows with occasional spinifex texture.

The assaying technique used is the industry standard for base metal assaying, which uses nitric and hydrochloric acids that extracts nickel only from sulphide mineralization and not from nickel silicate minerals.

The assaying of split core samples was conducted by Swastika Laboratories, and included the insertion of blanks and standards. The Qualified Person in charge of the Langmuir Project and the person who prepared the technical data in this release is Kian Jensen, B.Sc., P.Geo. (On), who is an arm's length party retained by the Company to carry out its exploration program on the Langmuir Project.

 

For further information, please contact Randy Miller, President of the Company, at tel: 416-842-9000, www.inspirationmining.com

For Investor Relations call:
Gale Capital Corporation
Ph. 604.221.7604
Fax 604.221.7606
galecapital@shaw.ca

The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Newsletter Sign-Up

Enter your email to receive email updates from us