NEWS

NEWS
News

Current News | Archives


Inspiration Intersects 0.812% Ni Over 25.67m or 84.22 Ft Containing 1.705% Ni Over 4.39m or 14.40ft (True Width)

FOR IMMEDIATE RELEASE

April, 30 2008 TSX - ISM Frankfurt- OI8

TORONTO, ONTARIO, (MARKET WIRE via COMTEX News Network) --

InspirationMining Corporation (TSX: ISM) (FRANKFURT: OI8) (the "Corporation") ispleased to announce the results of the continuation of their diamonddrilling program on its Langmuir Project, located in Langmuir Townshipsouth of Timmins, Ontario. The Langmuir Property consists of 69unpatented contiguous mining claim units covering approximately 1090hectares in the north-central portion of Langmuir Township, PorcupineMining Division, and District of Cochrane, Ontario. The property isapproximately 25 km southeast of Timmins, Ontario, and hosts the pastproducing Langmuir No.1 Mine, and majority of the past producingLangmuir No. 2 Mine.

Inspiration is continuing the drilling atthe Langmuir Project - Langmuir No.2 Mine - North Zone. The detailfill-in drill program is designed to complete the definition of thenickel bearing mineralization below the 100 metre level.

The following table indicates the drill information for the North Zone drill holes:


-----------------------------------------------------------------------
-----
Grid Grid Surveyed Section Section
Northing Easting Azimuth Northing Easting Length
Drill Hole (metres) (metres) Dip (ast) (metres) (metres) (m)
----------------------------------------------------------------------------
LN07-99 3182.47 1985.85 -58.26 300.18 3749.03 128.56 202.96
----------------------------------------------------------------------------
LN07-100 3182.28 1986.14 -67.25 300.35 3749.01 128.91 229.94
----------------------------------------------------------------------------
LN07-101 3182.09 1986.35 -73.15 296.87 3748.95 129.18 280.48
----------------------------------------------------------------------------

 

Drillholes LN07-99 to LN07-101, inclusively were drilled at the samelocation and approximately 25 metres east of previously released drillholes LN06-33 and LN06-34.

Drill Hole LN07-99 is approximately21 metres down dip of previously released drill hole LN06-34 with thenickel mineralization ranging from 80 metres to 140 metres belowsurface.

Drill Hole LN07-100 is approximately 36 metres downdip from LN07-99 with the nickel mineralization ranging from 120 metresto 210 metres below surface while LN07-101 is approximately 38 metresdown dip from LN07-100 with the nickel mineralization ranging from 142metres to 227 metres below surface.

The following assay resultsfor drill holes LN07-99 to LN07-101 at the Langmuir No.2 Mine - NorthZone have been received, compiled and condensed to the following:


-----------------------------------------------------------------------
-----
Core True Core True Weighted
From To Width Length Width Width Average Ni
Drill Hole (m) (m) (m) (m) (ft) (ft) (%)
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LN07-99 71.00 79.50 8.50 6.22 27.89 20.41 0.219
----------------------------------------------------------------------------
and
----------------------------------------------------------------------------
90.00 123.54 33.54 24.53 110.04 80.48 0.564
----------------------------------------------------------------------------
or 96.80 123.54 26.74 19.56 87.73 64.17 0.639
----------------------------------------------------------------------------
and contains
----------------------------------------------------------------------------
99.10 103.30 4.20 3.07 13.78 10.07 0.899
----------------------------------------------------------------------------
106.00 112.10 6.10 4.46 20.01 14.63 0.818
----------------------------------------------------------------------------
with 108.00 110.60 2.60 1.90 8.53 6.23 1.290
----------------------------------------------------------------------------
and 119.10 122.80 3.70 2.71 12.14 8.89 1.021
----------------------------------------------------------------------------
and
----------------------------------------------------------------------------
130.90 166.00 35.10 25.67 115.16 84.22 0.812
----------------------------------------------------------------------------
and contains
----------------------------------------------------------------------------
135.00 141.00 6.00 4.39 19.69 14.40 1.705
----------------------------------------------------------------------------
with 137.00 139.00 2.00 1.46 6.56 4.79 2.051
----------------------------------------------------------------------------
and
----------------------------------------------------------------------------
152.30 160.30 8.00 5.85 26.25 19.19 1.024
----------------------------------------------------------------------------
with 152.30 155.10 2.80 2.05 9.19 6.73 1.166
----------------------------------------------------------------------------
and 158.60 160.30 1.70 1.24 5.58 4.07 1.539
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LN07-100 88.98 227.90 138.92 87.43 455.77 286.84 0.346
----------------------------------------------------------------------------
and contains
----------------------------------------------------------------------------
157.00 177.00 20.00 12.59 65.62 41.31 0.468
----------------------------------------------------------------------------
with 159.00 164.72 5.72 3.60 18.77 11.81 0.655
----------------------------------------------------------------------------
171.22 177.00 5.78 3.64 18.96 11.94 0.516
----------------------------------------------------------------------------
and
----------------------------------------------------------------------------
200.24 227.90 27.66 17.41 90.75 57.12 0.544
----------------------------------------------------------------------------
with 205.47 213.34 7.87 4.95 25.82 16.24 0.763
----------------------------------------------------------------------------
or 210.55 213.34 2.79 1.76 9.15 5.77 0.989
----------------------------------------------------------------------------
and 219.93 225.00 5.07 3.19 16.63 10.47 0.757
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LN07-101 97.20 237.00 139.80 76.14 458.66 249.80 0.465
----------------------------------------------------------------------------
and contains
----------------------------------------------------------------------------
148.00 183.00 35.00 19.06 114.83 62.53 0.741
----------------------------------------------------------------------------
or 161.00 182.00 21.00 11.44 68.90 37.53 0.984
----------------------------------------------------------------------------
with 161.00 163.30 2.30 1.25 7.55 4.10 1.218
----------------------------------------------------------------------------
165.50 169.20 3.70 2.02 12.14 6.63 1.171
----------------------------------------------------------------------------
171.40 182.00 10.60 5.77 34.78 18.93 1.109
----------------------------------------------------------------------------
and
----------------------------------------------------------------------------
186.40 190.20 3.80 2.07 12.47 6.79 1.968
----------------------------------------------------------------------------
or 186.40 189.20 2.80 1.52 9.19 4.99 2.558
----------------------------------------------------------------------------
and
----------------------------------------------------------------------------
200.10 207.20 7.10 3.87 23.29 12.70 1.192
----------------------------------------------------------------------------
or 204.00 207.20 3.20 1.74 10.50 5.71 1.977
----------------------------------------------------------------------------

 

Thenickel bearing sulphide mineralization, with estimations ranging from1% to 20% fine-grained disseminatations up to massive 100% sulphides,is contained within serpentenized komatiitic ultramaftic extrusiveflows with occasional spinifex texture.

The assaying techniqueused is the industry standard for base metal assaying, which usesnitric and hydrochloric acids that extracts nickel only from sulphidemineralization and not from nickel silicate minerals.

Theassaying of split core samples was conducted by Swastika Laboratories,and included the insertion of blanks and standards. The QualifiedPerson in charge of the Langmuir Project and the person who preparedthe technical data in this release is Kian Jensen, B.Sc., P.Geo. (Ont).

For further information, please contact Randy Miller, President of the Company, at tel: 416-842-9000, www.inspirationmining.com

For Investor Relations call:
Gale Capital Corporation
Ph. 604.221.7604
Fax 604.221.7606
galecapital@shaw.ca

The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Newsletter Sign-Up

Enter your email to receive email updates from us