
FOR IMMEDIATE RELEASE
| May, 22 2008 | TSX - ISM Frankfurt- OI8 |
InspirationMining Corporation (the "Corporation") (TSX: ISM)(FRANKFURT: OI8) ispleased to announce the results of the continuation of their diamonddrilling program on its Langmuir Project, located in Langmuir Townshipsouth of Timmins, Ontario. The Langmuir Property consists of 69unpatented contiguous mining claim units covering approximately 1090hectares in the north-central portion of Langmuir Township, PorcupineMining Division, and District of Cochrane, Ontario. The property isapproximately 25 km southeast of Timmins, Ontario, and hosts the pastproducing Langmuir No.1 Mine, and majority of the past producingLangmuir No. 2 Mine.
Inspiration is continuing the drilling atthe Langmuir Project - Langmuir No.2 Mine - North Zone. The detailfill-in drill program is designed to complete the definition of thenickel bearing mineralization below the 100 metre level.
The following table indicates the drill information for the North Zone drill holes:
-----------------------------------------------------------------------
-
---------------------------------------------------------------------
---
Drill Hole Grid Grid Dip Surveyed Section Section Length
Northing Easting Azimuth Northing Easting (m)
(metres) (metres) (ast) (metres) (metres)
------------------------------------------------------------------------
------------------------------------------------------------------------
LN08-102 3198.74 2004.84 -49.92 299.13 3772.61 136.87 180.40
------------------------------------------------------------------------
LN08-103 3198.50 2005.20 -60.37 299.28 3772.59 137.31 250.35
------------------------------------------------------------------------
LN08-104 3198.39 2005.45 -67.25 296.75 3772.62 137.58 260.06
------------------------------------------------------------------------
LN08-105 3139.72 2007.80 -50.49 299.07 3722.98 168.95 226.89
------------------------------------------------------------------------
LN08-106 3139.61 2007.98 -56.20 298.13 3722.97 169.15 263.36
------------------------------------------------------------------------
------------------------------------------------------------------------
Drillholes LN08-102 to LN08-104, inclusively, were drilled from the same setup and were located approximately 24 metres north and 8 metres east ofpreviously released drill holes LN07-99 to LN07-101.
Drill HoleLN08-102 is approximately 10 metres down dip of previously releaseddrill hole LN05-10 and approximately 10 metres south with the nickelmineralization ranging from 91 metres to 114 metres below surface.
DrillHole LN08-103 is approximately 29 metres down dip from LN08-102 whileLN08-104 is approximately 60 metres down dip from LN08-102 with thenickel mineralization ranging from 108 metres to 193 metres belowsurface.
The following assay results for drill holes LN08-102to LN08-104 at the Langmuir No.2 Mine - North Zone have been received,compiled and condensed to the following:
---------------------------------------------------------------------
-
--------------------------------------------------------------------
Dr
ill Hole From (m) To (m) Core True Core True Weighted
Length Width Length Width Average
(m) (m) (ft) (ft) Ni (%)
---------------------------------------------------------------------
---------------------------------------------------------------------
---------------------------------------------------------------------
---------------------------------------------------------------------
LN08
-102 75.25 91.10 15.85 12.98 52.00 42.59 0.226
----------------------------------------------------------------
and
----------------------------------------------------------------
115.80 146.00 30.20 24.74 99.08 81.17 0.807
----------------------------------------------------------------
and
contains
----------------------------------------------------------------
122.00 139.87 17.87 14.64 58.63 48.03 1.094
----------------------------------------------------------------
or 123.57 134.15 10.58 8.67 34.71 28.44 1.475
----------------------------------------------------------------
with 126.00 130.06 4.06 3.33 13.32 10.93 2.149
----------------------------------------------------------------
and
----------------------------------------------------------------
151.27 153.29 2.02 1.65 6.63 5.41 0.482
----------------------------------------------------------------
and
----------------------------------------------------------------
175.93 178.26 2.33 1.91 7.64 6.27 0.431
---------------------------------------------------------------------
---------------------------------------------------------------------
---------------------------------------------------------------------
---------------------------------------------------------------------
LN08
-103 137.00 148.60 11.60 8.34 38.06 27.36 0.503
----------------------------------------------------------------
or 144.00 148.60 4.60 3.31 15.09 10.86 0.840
----------------------------------------------------------------
and
----------------------------------------------------------------
154.00 154.65 0.65 0.47 2.13 1.54 1.250
----------------------------------------------------------------
and
----------------------------------------------------------------
161.10 164.80 3.70 2.66 12.14 8.73 0.564
----------------------------------------------------------------
and
----------------------------------------------------------------
168.00 191.00 23.00 16.54 75.46 54.27 0.305
----------------------------------------------------------------
and
----------------------------------------------------------------
203.54 209.70 6.16 4.43 20.20 14.53 0.438
----------------------------------------------------------------
or 204.00 207.00 3.00 2.16 9.84 7.09 0.627
---------------------------------------------------------------------
---------------------------------------------------------------------
---------------------------------------------------------------------
---------------------------------------------------------------------
LN08
-104 106.80 227.81 121.01 77.78 397.01 255.18 0.476
----------------------------------------------------------------
and
contains
----------------------------------------------------------------
113.20 123.30 10.10 6.49 33.14 21.29 0.609
----------------------------------------------------------------
or 116.70 121.50 4.80 3.09 15.75 10.14 0.835
----------------------------------------------------------------
and
----------------------------------------------------------------
155.20 175.20 20.00 12.86 65.62 42.19 0.436
----------------------------------------------------------------
175.20 190.00 14.80 9.51 48.56 31.20 1.012
----------------------------------------------------------------
with 178.00 181.20 3.20 2.06 10.50 6.76 2.210
----------------------------------------------------------------
and
----------------------------------------------------------------
194.80 197.40 2.60 1.67 8.53 5.48 1.192
----------------------------------------------------------------
and
----------------------------------------------------------------
200.70 203.00 2.30 1.48 7.55 4.86 1.158
----------------------------------------------------------------
and
----------------------------------------------------------------
205.70 210.90 5.20 3.34 17.06 10.96 0.632
----------------------------------------------------------------
and
----------------------------------------------------------------
222.44 227.81 5.37 3.45 17.62 11.32 0.571
---------------------------------------------------------------------
---------------------------------------------------------------------
Drillholes LN08-105 and LN08-106 were drilled from the same set up and werelocated approximately 26 metres south and 40.5 metres east ofpreviously released drill holes LN07-99 to LN07-101 and approximately11.5 metres east of previously released drill holes LN05-4 and LN06-57.
Drill hole LN08-105 is located approximately 17.8 metres downdip from LN05-4 and 77.7 metres up dip from LN06-57 while LN08-106 islocated approximately 47.9 metres down dip from LN05-4 and 47.7 metresup dip from LN06-57.
The following assay results for drillholes LN08-105 and LN08-106 at the Langmuir No.2 Mine - North Zone havebeen received, compiled and condensed to the following:
---------------------------------------------------------------------
-
--------------------------------------------------------------------
Dr
ill Hole From (m) To (m) Core True Core True Weighted
Length Width Length Width Average
(m) (m) (ft) (ft) Ni (%)---------------------------------------------------------------------
---------------------------------------------------------------------
LN08
-105 80.50 201.30 120.80 100.51 396.33 329.76 0.337
----------------------------------------------------------------
or 132.90 183.45 50.55 41.91 165.85 137.50 0.457
----------------------------------------------------------------
and
contains
----------------------------------------------------------------
132.90 148.60 15.70 13.02 51.51 42.72 0.624
----------------------------------------------------------------
with 132.90 141.10 8.20 6.80 26.90 22.31 0.811
----------------------------------------------------------------
or 138.30 141.10 2.80 2.32 9.19 7.61 1.085
----------------------------------------------------------------
158.80 161.00 2.20 1.82 7.22 5.97 0.763
----------------------------------------------------------------
173.00 183.45 10.45 8.66 34.28 28.41 0.464
---------------------------------------------------------------------
---------------------------------------------------------------------
---------------------------------------------------------------------
---------------------------------------------------------------------
LN08
-106 87.95 224.12 136.17 104.31 446.75 342.22 0.346
----------------------------------------------------------------
or 148.50 224.12 75.62 57.93 248.10 190.06 0.423
----------------------------------------------------------------
and
contains
----------------------------------------------------------------
164.50 168.50 4.00 3.06 13.12 10.04 0.582
----------------------------------------------------------------
190.50 224.12 33.62 26.13 110.30 85.73 0.524
----------------------------------------------------------------
with 205.30 208.98 3.68 2.86 12.07 9.38 0.644
----------------------------------------------------------------
214.30 224.12 9.82 7.63 32.22 25.03 0.702
----------------------------------------------------------------
or 217.30 221.51 4.21 3.27 13.81 10.73 0.844
---------------------------------------------------------------------
---------------------------------------------------------------------
Thenickel bearing sulphide mineralization, with estimations ranging from1% to 20% fine-grained disseminatations up to massive 100% sulphides,is contained within serpentenized komatiitic ultramaftic extrusiveflows with occasional spinifex texture.
The assaying techniqueused is the industry standard for base metal assaying, which usesnitric and hydrochloric acids that extracts nickel only from sulphidemineralization and not from nickel silicate minerals.
Theassaying of split core samples was conducted by Swastika Laboratories,and included the insertion of blanks and standards. The QualifiedPerson in charge of the Langmuir Project and the person who preparedthe technical data in this release is Kian Jensen, B.Sc., P.Geo. (Ont).
For further information, please contact Randy Miller, President of the Company, at tel: 416-842-9000, www.inspirationmining.com
For Investor Relations call:
Gale Capital Corporation
Ph. 604.221.7604
Fax 604.221.7606
galecapital@shaw.ca
The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.